critical-path-server

v0.0.6

Build critical path css asynchronously on demand For more information about how to use this package see README

Latest version published 9 years ago
License: MIT

Ensure you're using the healthiest npm packages

Snyk scans all the packages in your projects for vulnerabilities and provides automated fix advice

Package Health Score

36 / 100

Security

Security review needed
All security vulnerabilities belong to production dependencies of direct and indirect packages.

Security and license risk for significant versions

All Versions
Version Vulnerabilities License Risk
0.0.6 | 02/2017
Popular
  • 0
    C
  • 0
    H
  • 0
    M
  • 0
    L
  • 0
    H
  • 0
    M
  • 0
    L
License
MIT
Security Policy
No

Is your project affected by vulnerabilities?

Scan your projects for vulnerabilities. Fix quickly with automated fixes. Get started with Snyk for free.

Get started free

Popularity

Limited

Weekly Downloads (1)

Download trend
GitHub Stars
28
Forks
6
Contributors
3

Direct Usage Popularity


The npm package critical-path-server receives a total of 1 downloads a week. As such, we scored critical-path-server popularity level to be Limited.

Based on project statistics from the GitHub repository for the npm package critical-path-server, we found that it has been starred 28 times.

Downloads are calculated as moving averages for a period of the last 12 months, excluding weekends and known missing data points.

Community

Limited
Readme.md
Yes
Contributing.md
No
Code of Conduct
No
Contributors
3
Funding
No

This project has seen only 10 or less contributors.

We found a way for you to contribute to the project! Looks like critical-path-server is missing a Code of Conduct.


Embed Package Health Score Badge

package health: 36/100 package health 36/100

Maintenance

Inactive
deprecated

Commit Frequency

No Recent Commits
Open Issues
1
Open PR
11
Last Release
9 years ago
Last Commit
5 years ago

Further analysis of the maintenance status of critical-path-server based on released npm versions cadence, the repository activity, and other data points determined that its maintenance is Inactive.

An important project maintenance signal to consider for critical-path-server is that it hasn't seen any new versions released to npm in the past 12 months, and could be considered as a discontinued project, or that which receives low attention from its maintainers.

In the past month we didn't find any pull request activity or change in issues status has been detected for the GitHub repository.

Package

Node.js Compatibility
7.4

Age
9 years
Dependencies
10 Direct
Versions
7
Install Size
0 B
Dist-tags
1
# of Files
0
Maintainers
1
TS Typings
No

critical-path-server has more than a single and default latest tag published for the npm package. This means, there may be other tags available for this package, such as next to indicate future releases, or stable to indicate stable releases.