We will be sunsetting Advisor during Jan, 2026 and will instead be providing information in Snyk Security DB.

You can begin to take advantage of Snyk Security DB today for a unified, package-centric experience.

botbuilder-composer

v0.2.0

Composer for Botbuilder For more information about how to use this package see README

Latest version published 8 years ago
License: LGPL-3.0

Ensure you're using the healthiest npm packages

Snyk scans all the packages in your projects for vulnerabilities and provides automated fix advice

Package Health Score

36 / 100

Security

Security review needed
All security vulnerabilities belong to production dependencies of direct and indirect packages.

Security and license risk for significant versions

All Versions
Version Vulnerabilities License Risk
0.2.0 | 03/2018
Popular
  • 0
    C
  • 0
    H
  • 0
    M
  • 0
    L
  • 0
    H
  • 0
    M
  • 0
    L
0.1.1 | 02/2018
  • 0
    C
  • 0
    H
  • 0
    M
  • 0
    L
  • 0
    H
  • 0
    M
  • 0
    L
License
LGPL-3.0
Alert

Non-Permissive License

We noticed that this project uses a license which requires less permissive conditions such as disclosing the source code, stating changes or redistributing the source under the same license. It is advised to further consult the license terms before use.

Security Policy
No

Is your project affected by vulnerabilities?

Scan your projects for vulnerabilities. Fix quickly with automated fixes. Get started with Snyk for free.

Get started free

Popularity

Limited

Weekly Downloads (1)

Download trend
GitHub Stars
1
Forks
0
Contributors
-

Direct Usage Popularity


The npm package botbuilder-composer receives a total of 1 downloads a week. As such, we scored botbuilder-composer popularity level to be Limited.

Based on project statistics from the GitHub repository for the npm package botbuilder-composer, we found that it has been starred 1 times.

Downloads are calculated as moving averages for a period of the last 12 months, excluding weekends and known missing data points.

Community

Limited
Readme.md
Yes
Contributing.md
No
Code of Conduct
No
Contributors
0
Funding
No

This project has seen only 10 or less contributors.

We found a way for you to contribute to the project! Looks like botbuilder-composer is missing a Code of Conduct.


Embed Package Health Score Badge

package health: 36/100 package health 36/100

Maintenance

Inactive

Commit Frequency

No Recent Commits
Open Issues
0
Open PR
0
Last Release
8 years ago
Last Commit
8 years ago

Further analysis of the maintenance status of botbuilder-composer based on released npm versions cadence, the repository activity, and other data points determined that its maintenance is Inactive.

An important project maintenance signal to consider for botbuilder-composer is that it hasn't seen any new versions released to npm in the past 12 months, and could be considered as a discontinued project, or that which receives low attention from its maintainers.

In the past month we didn't find any pull request activity or change in issues status has been detected for the GitHub repository.

Package

Node.js Compatibility
not defined

Age
8 years
Dependencies
1 Direct
Versions
3
Install Size
211 kB
Dist-tags
1
# of Files
26
Maintainers
1
TS Typings
No

botbuilder-composer has more than a single and default latest tag published for the npm package. This means, there may be other tags available for this package, such as next to indicate future releases, or stable to indicate stable releases.